Define parking and pedestrian coverage
Parking shades, covered walkways and designated outdoor shelters can be reviewed together where a facility needs several types of coverage. Identify the areas separately and include the required dimensions for each.
For an operating site, tell us about restricted areas, installation hours and access procedures. The programme needs to reflect those requirements as well as fabrication and delivery.
Include coating requirements in the scope
Where the specification calls for a marine-grade coating, share the required system and acceptance criteria. We can review APCS 6 or an equivalent where specified, with any alternative subject to the project's acceptance requirements.
Painted, powder-coated and hot-dip galvanized finishes are also available. The quotation identifies the selected finish; a city name alone does not determine the coating.
Agree civil works and installation interfaces
Foundations and excavation may be included or carried out by your civil contractor. Confirm that division early so the proposed scope and installation sequence are clear.
We also supply school, playground and pool shades, tensile structures, event tents and outdoor umbrella shades. Fabric replacement and repairs are available following review of the existing installation.